1
         / 
        of
        9
      
      
    SinoTrack
SinoTrack ST-907L 4G Vehicle Car GPS Tracker, Car Relay Anti Lost Alarm GPS Locator Real-Time Location Remote Control Cut Off Oil and Power Device for Car Motorcycle Truck Taxi, Support Platform
SinoTrack ST-907L 4G Vehicle Car GPS Tracker, Car Relay Anti Lost Alarm GPS Locator Real-Time Location Remote Control Cut Off Oil and Power Device for Car Motorcycle Truck Taxi, Support Platform
4.0 / 5.0
(275) 275 total reviews
Regular price
          
            $27.99
          
      
          Regular price
          
            
              
                
              
            
          Sale price
        
          $27.99
        
      
                  
                  
                  Quantity
                  
                  
                    
                      
                      
                      
                     
                  
Couldn't load pickup availability
Product Overview
- Brand: SinoTrack
- Special Feature:
- Connectivity Technology: GPS, LTE, GSM
- Supported Application: SinoTrackPRO
- Specific Uses For Product:
Product Features
- 【4G NETWORK SUPPORT】GPS tracking device with 4G network makes positioning more accurate, allowing you to avoid constantly worrying about car safety issues. GPS tracker for car ST-907L gps tracker include 2G and 4G network. Car gps tracker 907L when the 4G network signal is poor, it can automatically switch to a 2G network. In the case where the network cannot locate, you can also send instructions 6690000 to obtain SMS location information.
- 【MAIN FUNCTION】SinoTrack vehicle mini car tracker devices for Motorbike, Built-in GSM<E and GPRS antennas (SIM Card Not Include). ST-907L motorcycle gps tracker devices built-in backup battery 3.7V, 50mAh. This Vehicle tracking device very simple and easy to use for Motorcycle, Truck, Taxi, etc. Text message alerts for overspeed, shocking, leaving or entering areas, low battery, cut engine remotely and recover engine. You can check driving reports historical data saved during service on our platform
- 【CUT ENGINE REMOTELY】Using st-907L car relay 4g gps tracker, when you found your car was stolen, you can control your car remotely on your phone, cut the engine by sending SMS command, the vehicle will stop move until it received your SMS command “9400000”, prevent theft of your car on the parking lot. You can recover the engine by SMS command also.Only the car running below to 20KM/h,your car can stop when it get text command within a few sec. More than 20km/h,then your engine can't cut off.
- 【SUPPORT TRACKING PLATFORM LIFETIME】GPS locator tracker with online tracking service no subscription. Buy a SIM card for the car tracker (this GPS locator not include a SIM card, you need to buy another one), search sinotrackpro on web login or Search SinotrackPro download GPS APP from your tablet, pc or phone lifetime. Real-time tracking is available at no additional cost
- 【REAL TIME TRACKING】Real-time car GPS tracker ST-907L Anti Lost Alarm Locator based on GSM LTE , locating and monitoring remote targets with our own GPS tracking platform, which display of location information accurately ( Positioning accuracy up to 10 meters ). Sinotrack gps tracker for vehicles can save 2 years of tracking history . GPS location tracker device with 2 time in terval, You can view and play back your daily tracking history,when the car goes to a place,can make a clearer judgment
Product Information
| Product Dimensions | 1.22 x 1.22 x 2.24 inches | 
| Item Weight | 1.76 ounces | 
| ASIN | B089W9RR4M | 
| Item model number | ST-907L GPS Tracker | 
| Batteries | 1 Lithium Polymer batteries required. (included) | 
| Customer Reviews | |
| Best Sellers Rank | |
| Connectivity technologies | GPS, LTE, GSM | 
| Special features | Cut Engine Off,GPS Tracker,Real Time Tracking, Alert Notification, Geo-Fence, History Route Playback, Rechargeabl | 
| Other display features | Wireless | 
| Whats in the box | ST-907L 4G GPS Tracker, User Manual, Box | 
| Manufacturer | SINOTRACK | 
| Country of Origin | China | 
| Date First Available | June 9, 2020 | 
Share
 
 
 
 
 
 
 
 

 
     
     
     
     
     
     
     
    